Skip to main content

Damaged lift station repaired

May 9, 2011

COLUMBIA CITY — The Columbia City Board of Works and Safety received word last week that a brand-new sewer lift station, dinged up by an excavator during installation, is fully repaired and ready to be put in the ground.
“The repair has been made and meets the repair action plan,” said City Outside Operations Manager Jeff Walker on Friday.
“There was no real damage, it was more of a cosmetic and aesthetic issue than anything else. I’m pleased with how it turned out.”
——
To read the rest of this story, please order an e-subscription, found under the e-edition subscription link, or call The Post & Mail at 244-5153, ext. 207 and ask for a subscription.

Tri-lakes Baptist Church is playing host to a slew of youngsters this week for its High Power...
Columbia City resident Adam Neely is on a mission to preserve local lakes. Neely has been...
Columbia City High School is hosting a camp for aspiring cheerleaders. The camp is led by the high...

 

Premium Drupal Themes by Adaptivethemes