Skip to main content

Damaged lift station repaired

May 9, 2011

COLUMBIA CITY — The Columbia City Board of Works and Safety received word last week that a brand-new sewer lift station, dinged up by an excavator during installation, is fully repaired and ready to be put in the ground.
“The repair has been made and meets the repair action plan,” said City Outside Operations Manager Jeff Walker on Friday.
“There was no real damage, it was more of a cosmetic and aesthetic issue than anything else. I’m pleased with how it turned out.”
——
To read the rest of this story, please order an e-subscription, found under the e-edition subscription link, or call The Post & Mail at 244-5153, ext. 207 and ask for a subscription.

FORT WAYNE — The Columbia City Eagles’ boys’ basketball team wrapped up the regular season portion...
Caden Ferguson swims the butterfly for Indian Springs Middle School’s boys swim team at South Side...
CHURUBUSCO — In the same week that her sister, Heather, took home Saint Joseph’s College “Athlete...

 

Premium Drupal Themes by Adaptivethemes